Hauler discharging in the city
A hauler that takes its load to the Columbia Boulevard plant, under the City's program and its annual permit.
The City's septage hauler program and the DEQ license for pumping and hauling a portable restroom, and what the customer should ask.
Fastest: call (888) 351-0294. Or send this and we call you back.
Portland's Bureau of Environmental Services runs a septage hauler program, ENB-4.12, for haulers discharging at the city's Columbia Boulevard plant. It defines septage to include waste from chemical toilets, and it requires an annual permit, a valid DEQ Sewage Disposal Service license and DEQ pumping-equipment inspection forms for each truck. Portland Porta Potty Rental asks the hauler for those documents on the first call.
The waste in a portable restroom is regulated. The rules fall on the hauler who pumps it, and the customer who rents the unit is asked which hauler does the work and what that hauler holds.
The City's program applies to haulers that discharge at the Columbia Boulevard plant, and it defines septage to include waste from chemical toilets. Whether a portable-toilet operator outside the city must hold the same permit was not confirmed, so the hauler's own documents are asked for and checked.
The Oregon DEQ license for sewage disposal services is the state's requirement for the hauler's business. This page does not print a license number or a fee, and the statute numbers cited in some search results were not verified, so none is given.
Keep the unit's contents out of storm drains, ditches and open ground. Do not attempt to pump or move the contents yourself. Report a leak, an open tank or a spill to the number on the order and to the hauler at once.
The DEQ Sewage Disposal Service license held by the pumping business is asked for on the first call and checked.
Where the hauler discharges in the city, the annual permit under the program is asked for. Where it is not confirmed for an outside operator, the question is put to the City.
The pumping equipment's DEQ inspection form is asked for, for each truck used on the job.
The site is named and confirmed as a permitted disposal point, and the waste is kept separate on the way.
Each pumping is recorded with the date, the unit, the hauler and the site, and the record is given to the customer on request.
The City's septage program requires an annual permit, a valid DEQ Sewage Disposal Service license and DEQ pumping-equipment inspection forms for each truck, for haulers discharging at the city's plant.
The program defines septage to include waste from chemical toilets, which brings a portable restroom's contents within its scope.
The annual permit and the license are the hauler's documents. The customer does not hold them, but asks to see them.
The inspection forms are kept for each truck, so a hauler with a fleet shows a form for every vehicle it uses on the job.
It was not confirmed whether a portable-toilet operator outside the city must hold the same annual permit as a hauler discharging at the plant. The question is put to the City for each hauler.
A hauler that discharges elsewhere may be under a different arrangement. The DEQ license still applies to the pumping business.
Where the answer is unclear, the hauler's written statement of its arrangement is asked for, and the City is asked for the rule.
This page does not state the answer, because none was confirmed in the searches.
The DEQ Sewage Disposal Service license is the state requirement for the business. The statute numbers in some summaries were not verified, so this page cites none.
Oregon's DEQ sets rules for chemical toilets and for sewage tank trucks. The license and the rules are the state's, and the hauler is asked to show them.
A forum or an unofficial summary that cites a license statute was not used, because the statute could not be checked against the official text.
The DEQ is the source for the license and its terms.
The paperwork proves the rules were followed. A file for each rental holds the hauler's license details, the City permit answer, the inspection forms and the visit record.
The file is started on the first call with the hauler's name and its license details, and updated when the operator changes.
Each pumping is recorded with its date, the unit, the hauler and the disposal site.
A copy of the paperwork goes to the customer on request.
On the day of a pumping visit, the crew should be able to show the hauler's permit details, the inspection record for the truck and the facility the load is going to. A visit that cannot show them should be questioned before the load leaves the site.
Ask for the permit details and the state licence number at the visit, and check them against the copy on file. A number that differs from the copy is a reason to stop and ask, not a detail to correct by hand on the sheet.
Check that the truck's inspection record is current and is carried with the vehicle. The programme names those forms for each truck, so a truck without them is a truck the customer should not expect to pump their units.
Confirm the facility before the load is taken, and write its name on the visit record. The record should show the source, the date and the destination, so that the discharge can be traced if a question is raised later.
Where any of these checks fails, record the reason and tell the customer the same day. A pumping that is delayed for a documented reason is easier to explain than a unit that was emptied without a record.
A hauler that takes its load to the Columbia Boulevard plant, under the City's program and its annual permit.
A hauler that takes its load to another permitted site, under the DEQ license and the rules that apply to that site.
A hauler from another state that pumps units in Oregon, which must show the Oregon arrangement for that work.
The Columbia Boulevard plant is the City's treatment site named in the program, and the program applies to haulers that discharge there.
Oregon's DEQ onsite rules cover privies and portable toilet shelters, but the hauler provisions were not reviewed for this page.
A Washington-side unit follows Washington's septage rules, which were not searched.
Tell us when you need someone and we book the earliest visit a oregon septage hauling rules technician has, and you approve the price before any work starts.
Not sure if you're covered? Check your ZIP code.
The visit schedule that keeps units clean and usable, with pumping done by a licensed hauler and the record kept for the customer.
The standard single-stall unit for events, projects and yards across the Portland metro, delivered, placed, serviced and collected on a set schedule.
A rental for the length of a multi-month project, with a fixed weekly servicing plan, a repair route for damaged units and a written record.
Delivery and service to the Clark County towns across the river, planned under Washington's own rules, which are asked for on each order.
The City of Portland's septage hauler programme, run by its Bureau of Environmental Services, covers haulers who discharge at the Columbia Boulevard plant, and it defines septage to include waste from chemical toilets.
Clark County, Washington, is in a different state with its own rules.
The City's program defines septage to include waste from chemical toilets, which covers a portable restroom's contents.
A valid DEQ Sewage Disposal Service license for the pumping business, and the City's annual permit where the hauler discharges in the city.
No. The customer does not hold the license. The hauler does, and the customer asks for it.
That was not confirmed. The question is put to the City for each hauler.
No. The number is the hauler's, and the DEQ is the source for checking it.